42 USC CHAPTER 55, SUBCHAPTER IV: FEDERAL PERMITTING IMPROVEMENT
From Title 42—THE PUBLIC HEALTH AND WELFARECHAPTER 55—NATIONAL ENVIRONMENTAL POLICY

SUBCHAPTER IV—FEDERAL PERMITTING IMPROVEMENT

§4370m. Definitions

In this subchapter:

(1) Agency

The term "agency" has the meaning given the term in section 551 of title 5.

(2) Agency CERPO

The term "agency CERPO" means the chief environmental review and permitting officer of an agency, as designated by the head of the agency under section 4370m–1(b)(2)(A)(iii)(I) of this title.

(3) Authorization

The term "authorization" means any license, permit, approval, finding, determination, or other administrative decision issued by an agency that is required or authorized under Federal law in order to site, construct, reconstruct, or commence operations of a covered project administered by a Federal agency or, in the case of a State that chooses to participate in the environmental review and authorization process in accordance with section 4370m–2(c)(3)(A) of this title, a State agency.

(4) Cooperating agency

The term "cooperating agency" means any agency with—

(A) jurisdiction under Federal law; or

(B) special expertise as described in section 1501.6 of title 40, Code of Federal Regulations (as in effect on December 4, 2015).

(5) Council

The term "Council" means the Federal Infrastructure Permitting Improvement Steering Council 1 established under section 4370m–1(a) of this title.

(6) Covered project

(A) In general

The term "covered project" means any activity in the United States that requires authorization or environmental review by a Federal agency involving construction of infrastructure for renewable or conventional energy production, electricity transmission, surface transportation, aviation, ports and waterways, water resource projects, broadband, pipelines, manufacturing, or any other sector as determined by a majority vote of the Council that—

(i)(I) is subject to NEPA;

(II) is likely to require a total investment of more than $200,000,000; and

(III) does not qualify for abbreviated authorization or environmental review processes under any applicable law; or

(ii) is subject to NEPA and the size and complexity of which, in the opinion of the Council, make the project likely to benefit from enhanced oversight and coordination, including a project likely to require—

(I) authorization from or environmental review involving more than 2 Federal agencies; or

(II) the preparation of an environmental impact statement under NEPA.

(B) Exclusion

The term "covered project" does not include—

(i) any project subject to section 139 of title 23; or

(ii) any project subject to section 2348 of title 33.

(7) Dashboard

The term "Dashboard" means the Permitting Dashboard required under section 4370m–2(b) of this title.

(8) Environmental assessment

The term "environmental assessment" means a concise public document for which a Federal agency is responsible under section 1508.9 of title 40, Code of Federal Regulations (or successor regulations).

(9) Environmental document

(A) In general

The term "environmental document" means an environmental assessment, finding of no significant impact, notice of intent, environmental impact statement, or record of decision.

(B) Inclusions

The term "environmental document" includes—

(i) any document that is a supplement to a document described in subparagraph (A); and

(ii) a document prepared pursuant to a court order.

(10) Environmental impact statement

The term "environmental impact statement" means the detailed written statement required under section 102(2)(C) of NEPA [42 U.S.C. 4332(2)(C)].

(11) Environmental review

The term "environmental review" means the agency procedures and processes for applying a categorical exclusion or for preparing an environmental assessment, an environmental impact statement, or other document required under NEPA.

(12) Executive Director

The term "Executive Director" means the Executive Director appointed by the President under section 4370m–1(b)(1)(A) of this title.

(13) Facilitating agency

The term "facilitating agency" means the agency that receives the initial notification from the project sponsor required under section 4370m–2(a) of this title.

(14) Inventory

The term "inventory" means the inventory of covered projects established by the Executive Director under section 4370m–1(c)(1)(A) of this title.

(15) Lead agency

The term "lead agency" means the agency with principal responsibility for an environmental review of a covered project under NEPA and parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations).

(16) NEPA

The term "NEPA" means the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(17) Participating agency

The term "participating agency" means an agency participating in an environmental review or authorization for a covered project in accordance with section 4370m–2 of this title.

(18) Project sponsor

The term "project sponsor" means an entity, including any private, public, or public-private entity, seeking an authorization for a covered project.

(Pub. L. 114–94, div. D, title XLI, §41001, Dec. 4, 2015, 129 Stat. 1741.)

References in Text

The National Environmental Policy Act of 1969 or NEPA, referred to in pars. (6)(A), (11), and (15) and defined in (16), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of this title and Tables.

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

Savings Clause

Pub. L. 114–94, div. A, title XI, §11503(b), Dec. 4, 2015, 129 Stat. 1692, provided that: "Except as expressly provided in section 41003(f) [42 U.S.C. 4370m–2(f)] and subsection (o) of section 139 of title 23, United States Code, the requirements and other provisions of title 41 of this Act [probably means title XLI of div. D of Pub. L. 114–94, 42 U.S.C. 4370m et seq.] shall not apply to—

"(1) programs administered now and in the future by the Department of Transportation or its operating administrations under title 23, 46, or 49, United States Code, including direct loan and loan guarantee programs, or other Federal statutes or programs or projects administered by an agency pursuant to their authority under title 49, United States Code; or

"(2) any project subject to section 2045 of the Water Resources Development Act of 2007 (33 U.S.C. 2348)."

Placement in United States Code

Pub. L. 114–94, div. D, title XLI, §41014, Dec. 4, 2015, 129 Stat. 1762, provided that: "The Office of the Law Revision Counsel is directed to place sections 41001 through 41013 of this title in chapter 55 of title 42, United States Code, as subchapter IV."

Ex. Ord. No. 13766. Expediting Environmental Reviews and Approvals for High Priority Infrastructure Projects

Ex. Ord. No. 13766, Jan. 24, 2017, 82 F.R. 8657, provided:

By the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct as follows:

Section 1. Purpose. Infrastructure investment strengthens our economic platform, makes America more competitive, creates millions of jobs, increases wages for American workers, and reduces the costs of goods and services for American families and consumers. Too often, infrastructure projects in the United States have been routinely and excessively delayed by agency processes and procedures. These delays have increased project costs and blocked the American people from the full benefits of increased infrastructure investments, which are important to allowing Americans to compete and win on the world economic stage. Federal infrastructure decisions should be accomplished with maximum efficiency and effectiveness, while also respecting property rights and protecting public safety and the environment. To that end, it is the policy of the executive branch to streamline and expedite, in a manner consistent with law, environmental reviews and approvals for all infrastructure projects, especially projects that are a high priority for the Nation, such as improving the U.S. electric grid and telecommunications systems and repairing and upgrading critical port facilities, airports, pipelines, bridges, and highways.

Sec. 2. Identification of High Priority Infrastructure Projects. With respect to infrastructure projects for which Federal reviews and approvals are required, upon request by the Governor of a State, or the head of any executive department or agency (agency), or on his or her own initiative, the Chairman of the White House Council on Environmental Quality (CEQ) shall, within 30 days after a request is made, decide whether an infrastructure project qualifies as a "high priority" infrastructure project. This determination shall be made after consideration of the project's importance to the general welfare, value to the Nation, environmental benefits, and such other factors as the Chairman deems relevant.

Sec. 3. Deadlines. With respect to any project designated as a high priority under section 2 of this order, the Chairman of the CEQ shall coordinate with the head of the relevant agency to establish, in a manner consistent with law, expedited procedures and deadlines for completion of environmental reviews and approvals for such projects. All agencies shall give highest priority to completing such reviews and approvals by the established deadlines using all necessary and appropriate means. With respect to deadlines established consistent with this section that are not met, the head of the relevant agency shall provide a written explanation to the Chairman explaining the causes for the delay and providing concrete actions taken by the agency to complete such reviews and approvals as expeditiously as possible.

Sec. 4. General Provisions. (a) This order shall be implemented consistent with applicable law and subject to the availability of appropriations.

(b) Nothing in this order shall be construed to impair or otherwise affect:

(i) the authority granted by law to an executive department or agency or the head thereof; or

(ii) the functions of the Director of the Office of Management and Budget relating to budgetary, administrative, or legislative proposals.

(c) All actions taken pursuant to this order shall be consistent with requirements and authorities to protect intelligence and law enforcement sources and methods. Nothing in this order shall be interpreted to supersede measures established under authority of law to protect the security and integrity of specific activities and associations that are in direct support of intelligence and law enforcement operations.

(d) This order is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person.

Donald J. Trump.      

Ex. Ord. No. 13807. Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects

Ex. Ord. No. 13807, Aug. 15, 2017, 82 F.R. 40463, provided:

By the authority vested in me as President by the Constitution and the laws of the United States of America, and in order to ensure that the Federal environmental review and permitting process for infrastructure projects is coordinated, predictable, and transparent, it is hereby ordered as follows:

Section 1. Purpose. America needs increased infrastructure investment to strengthen our economy, enhance our competitiveness in world trade, create jobs and increase wages for our workers, and reduce the costs of goods and services for our families. The poor condition of America's infrastructure has been estimated to cost a typical American household thousands of dollars each year. Inefficiencies in current infrastructure project decisions, including management of environmental reviews and permit decisions or authorizations, have delayed infrastructure investments, increased project costs, and blocked the American people from enjoying improved infrastructure that would benefit our economy, society, and environment. More efficient and effective Federal infrastructure decisions can transform our economy, so the Federal Government, as a whole, must change the way it processes environmental reviews and authorization decisions.

Sec. 2. Policy. It is the policy of the Federal Government to:

(a) safeguard our communities and maintain a healthy environment;

(b) ensure that Federal authorities make informed decisions concerning the environmental impacts of infrastructure projects;

(c) develop infrastructure in an environmentally sensitive manner;

(d) provide transparency and accountability to the public regarding environmental review and authorization decisions;

(e) be good stewards of public funds, including those used to develop infrastructure projects, and avoid duplicative and wasteful processes;

(f) conduct environmental reviews and authorization processes in a coordinated, consistent, predictable, and timely manner in order to give public and private investors the confidence necessary to make funding decisions for new infrastructure projects;

(g) speak with a coordinated voice when conducting environmental reviews and making authorization decisions; and

(h) make timely decisions with the goal of completing all Federal environmental reviews and authorization decisions for major infrastructure projects within 2 years.

Sec. 3. Definitions. The terms of this order shall be applied consistently with those defined under 42 U.S.C. 4370m and implementing guidance to the maximum extent possible. The following definitions shall specifically apply:

(a) "Authorization" means any license, permit, approval, finding, determination, or other administrative decision issued by a Federal department or agency (agency) that is required or authorized under Federal law in order to site, construct, reconstruct, or commence operations of an infrastructure project, including any authorization under 42 U.S.C. 4370m(3).

(b) "CAP Goals" means Federal Government Priority Goals established by the Government Performance and Results Act (GPRA) Modernization Act of 2010, Public Law 111–352, 124 Stat. 3866, and commonly referred to as Cross-Agency Priority (CAP) Goals.

(c) "Federal Permitting Improvement Steering Council" or "FPISC" means the entity established under 42 U.S.C. 4370m–1.

(d) "Infrastructure project" means a project to develop the public and private physical assets that are designed to provide or support services to the general public in the following sectors: surface transportation, including roadways, bridges, railroads, and transit; aviation; ports, including navigational channels; water resources projects; energy production and generation, including from fossil, renewable, nuclear, and hydro sources; electricity transmission; broadband Internet; pipelines; stormwater and sewer infrastructure; drinking water infrastructure; and other sectors as may be determined by the FPISC.

(e) "Major infrastructure project" means an infrastructure project for which multiple authorizations by Federal agencies will be required to proceed with construction, the lead Federal agency has determined that it will prepare an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et seq., and the project sponsor has identified the reasonable availability of funds sufficient to complete the project.

(f) "Permitting timetable" means an environmental review and authorization schedule, or other equivalent schedule, for a project or group of projects that identifies milestones—including intermediate and final completion dates for action by each agency on any Federal environmental review or authorization required for a project or group of projects—that is prepared by the lead Federal agency in consultation with all cooperating and participating agencies.

Sec. 4. Agency Performance Accountability. Federal agencies should follow transparent and coordinated processes for conducting environmental reviews and making authorization decisions. These processes must include early and open coordination among Federal, State, tribal, and local agencies and early engagement with the public. Holding Federal agencies accountable for their progress on implementing the policy set forth in section 2 of this order should, among other things, produce measurably better environmental outcomes with respect to infrastructure development.

(a) Performance Priority Goals.

(i) CAP Goal. A CAP Goal is a Federal tool for accelerating progress in priority areas that require active collaboration among multiple agencies to overcome organizational barriers and to achieve better performance than one agency could achieve on its own. Within 180 days of the date of this order, the Director of the Office of Management and Budget (OMB), in consultation with the FPISC, shall establish a CAP Goal on Infrastructure Permitting Modernization so that, where permitted by law:

(A) Federal environmental reviews and authorization processes for infrastructure projects are consistent, coordinated, and predictable; and

(B) the time for the Federal Government's processing of environmental reviews and authorization decisions for new major infrastructure projects should be reduced to not more than an average of approximately 2 years, measured from the date of the publication of a notice of intent to prepare an environmental impact statement or other benchmark deemed appropriate by the Director of OMB.

(ii) Agency Goals. All Federal agencies with environmental review, authorization, or consultation responsibilities for infrastructure projects shall modify their Strategic Plans and Annual Performance Plans under the GPRA Modernization Act of 2010 to include agency performance goals related to the completion of environmental reviews and authorizations for infrastructure projects consistent with the new CAP Goal on Infrastructure Permitting Modernization. The agencies shall integrate the achievement of these performance goals into appropriate agency personnel performance plans, such as those of the agency Chief Environmental Review and Permitting Officers (CERPOs) or other appropriate officials, consistent with guidance to be provided by OMB, in consultation with the Office of Personnel Management. Progress on these goals shall be reviewed and analyzed by agency leadership, pursuant to the GPRA Modernization Act of 2010.

(b) Accountability. Within 180 days of the establishment of the CAP Goal on Infrastructure Permitting Modernization, as described in subsection (a) of this section, or such longer period of time as determined by the Director of OMB, OMB, in consultation with the FPISC, shall issue guidance for establishing a performance accountability system to facilitate achievement of the CAP Goal.

(i) Tracking of Major Infrastructure Projects. The performance accountability system shall track each major infrastructure project. The performance accountability system shall include, at a minimum, assessments of the agency's performance with respect to each of the following areas, as applicable:

(A) whether major infrastructure projects are processed using the "One Federal Decision" mechanism, as described in subsection 5(b) of this order;

(B) whether major infrastructure projects have a permitting timetable;

(C) whether major infrastructure projects follow an effective process that automatically elevates instances in which permitting timetable milestones are missed or extended, or are anticipated to be missed or extended, to appropriate senior agency officials;

(D) whether agencies are meeting the established milestones in the permitting timetable;

(E) the time it takes to complete the processing of environmental reviews and authorizations for each major infrastructure project; and

(F) the costs of the environmental reviews and authorizations for each major infrastructure project.

(ii) Scoring. The accountability system shall include a scoring mechanism that shall follow, at a minimum, the following procedures:

(A) agencies will submit information to OMB, consistent with existing reporting mechanisms to the maximum extent possible, on the assessment areas described in subsection (b)(i) of this section;

(B) at least once per quarter, OMB will produce a scorecard of agency performance and overall progress toward achieving CAP Goal targets;

(C) where an agency's inability to meet a permitting timetable milestone results in a significant delay of the project timeline, after consulting with the project sponsor and relevant agencies, agencies will submit (based on OMB guidance) an estimate of the delay's costs to the project; and

(D) the Director of OMB will consider each agency's performance during budget formulation and determine whether appropriate penalties, including those authorized at 23 U.S.C. 139(h)(7) and 33 U.S.C. 2348(h)(5), must or should be imposed, to the extent required or permitted by law, for those that significantly fail to meet a permitting timetable milestone or in other situations deemed appropriate by the Director of OMB after considering the causes of any poor performance.

(iii) Best Practices. Agencies shall implement the techniques and strategies the FPISC annually identifies as best practices pursuant to 42 U.S.C. 4370m–1(c)(2)(B), as appropriate. The performance accountability system shall track and score agencies on the incorporation and implementation of appropriate best practices for all infrastructure projects, including the implementation of such best practices at an agency's field level.

Sec. 5. Process Enhancements. In furtherance of the policy described in section 2 of this order, Federal agencies shall follow a more unified environmental review and authorization process.

(a) Processing of Major Infrastructure Projects. In processing environmental reviews and authorizations for major infrastructure projects, Federal agencies shall:

(i) use "One Federal Decision" described in subsection (b) of this section;

(ii) develop and follow a permitting timetable, which shall be reviewed and updated at least quarterly by the lead Federal agency in consultation with Federal cooperating and participating agencies; and

(iii) follow an effective process that automatically elevates instances where a permitting timetable milestone is missed or extended, or is anticipated to be missed or extended, to appropriate senior agency officials of the lead Federal agency and the cooperating and participating Federal agency or agencies to which the milestone applies.

(b) One Federal Decision.

(i) Each major infrastructure project shall have a lead Federal agency, which shall be responsible for navigating the project through the Federal environmental review and authorization process, including the identification of a primary Federal point of contact at each Federal agency. All Federal cooperating and participating agencies shall identify points of contact for each project, cooperate with the lead Federal agency point of contact, and respond to all reasonable requests for information from the lead Federal agency in a timely manner.

(ii) With respect to the applicability of NEPA to a major infrastructure project, the Federal lead, cooperating, and participating agencies for each major infrastructure project shall all record any individual agency decision in one Record of Decision (ROD), which shall be coordinated by the lead Federal agency unless the project sponsor requests that agencies issue separate NEPA documents, the NEPA obligations of a cooperating or participating agency have already been satisfied, or the lead Federal agency determines that a single ROD would not best promote completion of the project's environmental review and authorization process. The Federal lead, cooperating, and participating agencies shall all agree to a permitting timetable that includes the completion dates for the ROD and the federally required authorizations for the project.

(iii) All Federal authorization decisions for the construction of a major infrastructure project shall be completed within 90 days of the issuance of a ROD by the lead Federal agency, provided that the final EIS includes an adequate level of detail to inform agency decisions pursuant to their specific statutory authority and requirements. The lead Federal agency may extend the 90-day deadline if the lead Federal agency determines that Federal law prohibits the agency from issuing its approval or permit within the 90-day period, the project sponsor requests that the permit or approval follow a different timeline, or the lead Federal agency determines that an extension would better promote completion of the project's environmental review and authorization process.

(iv) The Council on Environmental Quality (CEQ) and OMB shall develop the framework for implementing One Federal Decision, in consultation with the FPISC.

(A) The framework should be consistent with the model processes established under 42 U.S.C. 4370m–2, 23 U.S.C. 139, 33 U.S.C. 2348, the 2015 "Red Book" (officially entitled "Synchronizing Environmental Reviews for Transportation and Other Infrastructure Projects"), and CEQ guidance on efficient and timely environmental reviews under NEPA.

(B) The framework shall also include guidance on the development of permitting timetables by the lead Federal agencies, in collaboration with Federal cooperating and participating agencies. Permitting timetables shall identify estimated intermediate and final completion dates for all environmental reviews and authorizations that are reasonably anticipated as being needed for a project, including the process for granting extensions of any established dates. The guidance shall specify that lead Federal agencies need not include the estimated intermediate and final completion dates of any such reviews or authorizations until the design of a project has sufficiently advanced so that they can be developed. In such cases, the guidance shall instruct lead Federal agencies to estimate when the project's design will be advanced enough to determine such dates. The timelines shall account for any federally required decisions or permits that are assumed by, or delegated to, State, tribal, or local agencies and the extent to which any approval or permit to be issued by a Federal agency is dependent upon the issuance of such a decision or permit.

(C) CEQ and OMB shall also develop guidance for applying One Federal Decision whenever the lead agency is a State, tribal, or local agency exercising an assignment or delegation of an agency's NEPA responsibilities.

(c) Dashboard. All projects subject to 23 U.S.C. 139 and "covered projects" under 42 U.S.C. 4370m shall be tracked on the Dashboard established under 42 U.S.C. 4370m–2(b). Other projects or classes of projects subject to special environmental review and authorization streamlining processes similar to those referenced in this subsection may also be tracked on the Dashboard at the discretion of the FPISC Executive Director. The dates for milestones of all projects tracked on the Dashboard shall be updated monthly, or on another appropriate timeline as may be determined by the FPISC Executive Director.

(d) Executive Order 13766. For purposes of implementing Executive Order 13766 of January 24, 2017 (Expediting Environmental Reviews and Approvals for High Priority Infrastructure Projects), all infrastructure projects that meet the criteria for, and are subject to, 23 U.S.C. 139, 33 U.S.C. 2348, or 42 U.S.C. 4370m–4370m–12 shall qualify as high priority projects under Executive Order 13766. Other projects or classes of projects subject to special environmental review and authorization streamlining processes, similar to those referenced in this subsection as may be determined by the FPISC Executive Director in consultation with OMB and CEQ, shall also qualify as high priority infrastructure projects under Executive Order 13766. The CEQ Chairman's responsibilities under sections 2 and 3 of Executive Order 13766 shall be satisfied by referring the project to the FPISC Executive Director, the Secretary of Transportation, or the Assistant Secretary of the Army for Civil Works, as appropriate.

(e) Council on Environmental Quality.

(i) Directives. Within 30 days of the date of this order, the CEQ shall develop an initial list of actions it will take to enhance and modernize the Federal environmental review and authorization process. Such actions should include issuing such regulations, guidance, and directives as CEQ may deem necessary to:

(A) ensure optimal interagency coordination of environmental review and authorization decisions, including by providing for an expanded role and authorities for lead agencies, more clearly defined responsibilities for cooperating and participating agencies, and Government-wide applicability of NEPA decisions and analyses;

(B) ensure that environmental reviews and authorization decisions involving multiple agencies are conducted in a manner that is concurrent, synchronized, timely, and efficient;

(C) provide for agency use, to the maximum extent permitted by law, of environmental studies, analysis, and decisions conducted in support of earlier Federal, State, tribal, or local environmental reviews or authorization decisions; and

(D) ensure that agencies apply NEPA in a manner that reduces unnecessary burdens and delays as much as possible, including by using CEQ's authority to interpret NEPA to simplify and accelerate the NEPA review process.

(ii) Dispute Resolution. Except where dispute resolution processes are otherwise provided for in law, including under 42 U.S.C. 4370m–2, or by Executive Order or other Presidential directive, upon request of a lead Federal agency, cooperating agency, or participating agency, CEQ may mediate interagency disputes arising between Federal agencies concerning Federal environmental review or authorization decisions for any infrastructure project pertaining to any environmental law, regulation, order or policy, and shall facilitate resolution of any conflicting positions of the relevant agencies.

(iii) Agency Procedures. CEQ shall form and lead an interagency working group, consisting of the Director of OMB, agency CERPOs, and such other representatives of agencies as CEQ deems appropriate. The working group shall review the NEPA implementing regulations and other environmental review and authorization processing policies of agencies that are members of the FPISC to identify impediments to efficient and effective environmental reviews and authorizations for infrastructure projects. The working group shall also identify those agencies that require an action plan to address identified impediments. Based on this review, agencies shall develop action plans that set forth the actions they will take and timelines for completing those actions, and they shall submit those action plans to CEQ and OMB for comment. Each agency's action plan shall, at a minimum, establish procedures for a regular review and update of categorical exclusions, where appropriate.

(f) Federal Permitting Improvement Steering Council.

(i) Organizational Support. Unless otherwise determined by the Director of OMB, the General Services Administration (GSA) shall provide necessary administrative and organizational support to the FPISC, including personnel, procurement, and budget support. The GSA Administrator, or the head of another agency designated by the Director of OMB, may delegate any authority to the FPISC Executive Director necessary for the operation and administration of the FPISC and the Office of the Executive Director, and the Executive Director may redelegate these authorities, as appropriate.

(ii) Additional Duties. In addition to the duties and responsibilities charged to the FPISC Executive Director under 42 U.S.C. 4370m–4370m–12 and this order, the FPISC Executive Director may, upon request of a FPISC member agency or a project sponsor, work with the lead agency or any cooperating and participating agencies to facilitate the environmental review and authorization process for any infrastructure project regardless of whether the project is a "covered project" under 42 U.S.C. 4370m, including by resolving disputes and promoting early coordination. The FPISC Executive Director, the Director of OMB, or the Chairman of CEQ may establish any appropriate policies or procedures concerning the FPISC Executive Director's facilitation of the environmental review and authorization process under this subsection. Agencies must cooperate with the FPISC Executive Director with respect to the implementation of these additional duties.

(g) Energy Corridors. The Departments of the Interior and Agriculture, as appropriate, shall be the lead agencies for facilitating the identification and designation of energy right-of-way corridors on Federal lands for Government-wide expedited environmental review for the development of energy infrastructure projects.

(h) The Department of the Interior shall provide to OMB a strategy and recommendations for a multi-agency reorganization effort that would further the aims of this order. OMB, in consultation with the Department of the Interior, shall coordinate with the heads of other agencies affected to incorporate the strategy, as appropriate, into the comprehensive reorganization plan developed under Executive Order 13781 of March 13, 2017 (Comprehensive Plan for Reorganizing the Executive Branch).

Sec. 6. Executive Order 13690 of January 30, 2015 (Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input), is revoked.

Sec. 7. General Provisions. (a) Nothing in this order shall be construed to impair or otherwise affect:

(i) the authority granted by law to an executive department, agency, or the head thereof; or

(ii) the functions of the Director of the Office of Management and Budget relating to budgetary, administrative, or legislative proposals.

(b) This order shall be implemented consistent with applicable law and subject to the availability of appropriations.

(c) This order is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person.

Donald J. Trump.      

1 So in original. Probably should be "Federal Permitting Improvement Steering Council".

§4370m–1. Federal Permitting Improvement Council

(a) Establishment

There is established the Federal Permitting Improvement Steering Council.

(b) Composition

(1) Chair

The Executive Director shall—

(A) be appointed by the President; and

(B) serve as Chair of the Council.

(2) Council members

(A) In general

(i) Designation by head of agency

Each individual listed in subparagraph (B) shall designate a member of the agency in which the individual serves to serve on the Council.

(ii) Qualifications

A councilmem-ber 1 described in clause (i) shall hold a position in the agency of deputy secretary (or the equivalent) or higher.

(iii) Support

(I) In general

Consistent with guidance provided by the Director of the Office of Management and Budget, each individual listed in subparagraph (B) shall designate 1 or more appropriate members of the agency in which the individual serves to serve as an agency CERPO.

(II) Reporting

In carrying out the duties of the agency CERPO under this subchapter, an agency CERPO shall report directly to a deputy secretary (or the equivalent) or higher.

(B) Heads of agencies

The individuals that shall each designate a councilmember under this subparagraph are as follows:

(i) The Secretary of Agriculture.

(ii) The Secretary of the Army.

(iii) The Secretary of Commerce.

(iv) The Secretary of the Interior.

(v) The Secretary of Energy.

(vi) The Secretary of Transportation.

(vii) The Secretary of Defense.

(viii) The Administrator of the Environmental Protection Agency.

(ix) The Chairman of the Federal Energy Regulatory Commission.

(x) The Chairman of the Nuclear Regulatory Commission.

(xi) The Secretary of Homeland Security.

(xii) The Secretary of Housing and Urban Development.

(xiii) The Chairman of the Advisory Council on Historic Preservation.

(xiv) Any other head of a Federal agency that the Executive Director may invite to participate as a member of the Council.

(3) Additional members

In addition to the members listed in paragraphs (1) and (2), the Chairman of the Council on Environmental Quality and the Director of the Office of Management and Budget shall also be members of the Council.

(c) Duties

(1) Executive Director

(A) Inventory development

The Executive Director, in consultation with the Council, shall—

(i) not later than 180 days after December 4, 2015, establish an inventory of covered projects that are pending the environmental review or authorization of the head of any Federal agency;

(ii)(I) categorize the projects in the inventory as appropriate, based on sector and project type; and

(II) for each category, identify the types of environmental reviews and authorizations most commonly involved; and

(iii) add a covered project to the inventory after receiving a notice described in section 4370m–2(a)(1) of this title.

(B) Facilitating agency designation

The Executive Director, in consultation with the Council, shall—

(i) designate a facilitating agency for each category of covered projects described in subparagraph (A)(ii); and

(ii) publish the list of designated facilitating agencies for each category of projects in the inventory on the Dashboard in an easily accessible format.

(C) Performance schedules

(i) In general

Not later than 1 year after December 4, 2015, the Executive Director, in consultation with the Council, shall develop recommended performance schedules, including intermediate and final completion dates, for environmental reviews and authorizations most commonly required for each category of covered projects described in subparagraph (A)(ii).

(ii) Requirements

(I) In general

The performance schedules shall reflect employment of the use of the most efficient applicable processes, including the alignment of Federal reviews of projects and reduction of permitting and project delivery time.

(II) Limit

(aa) In general

The final completion dates in any performance schedule for the completion of an environmental review or authorization under clause (i) shall not exceed the average time to complete an environmental review or authorization for a project within that category.

(bb) Calculation of average time

The average time referred to in item (aa) shall be calculated on the basis of data from the preceding 2 calendar years and shall run from the period beginning on the date on which the Executive Director must make a specific entry for the project on the Dashboard under section 4370m–2(b)(2) of this title (except that, for projects initiated before that duty takes effect, the period beginning on the date of filing of a completed application), and ending on the date of the issuance of a record of decision or other final agency action on the review or authorization.

(cc) Completion date

Each performance schedule shall specify that any decision by an agency on an environmental review or authorization must be issued not later than 180 days after the date on which all information needed to complete the review or authorization (including any hearing that an agency holds on the matter) is in the possession of the agency.

(iii) Review and revision

Not later than 2 years after the date on which the performance schedules are established under this subparagraph, and not less frequently than once every 2 years thereafter, the Executive Director, in consultation with the Council, shall review and revise the performance schedules.

(D) Guidance

The Executive Director, in consultation with the Council, may recommend to the Director of the Office of Management and Budget or to the Council on Environmental Quality, as appropriate, that guidance be issued as necessary for agencies—

(i) to carry out responsibilities under this subchapter; and

(ii) to effectuate the adoption by agencies of the best practices and recommendations of the Council described in paragraph (2).

(2) Council

(A) Recommendations

(i) In general

The Council shall make recommendations to the Executive Director with respect to the designations under paragraph (1)(B) and the performance schedules under paragraph (1)(C).

(ii) Update

The Council may update the recommendations described in clause (i).

(B) Best practices

Not later than 1 year after December 4, 2015, and not less frequently than annually thereafter, the Council shall issue recommendations on the best practices for—

(i) enhancing early stakeholder engagement, including fully considering and, as appropriate, incorporating recommendations provided in public comments on any proposed covered project;

(ii) ensuring timely decisions regarding environmental reviews and authorizations, including through the development of performance metrics;

(iii) improving coordination between Federal and non-Federal governmental entities, including through the development of common data standards and terminology across agencies;

(iv) increasing transparency;

(v) reducing information collection requirements and other administrative burdens on agencies, project sponsors, and other interested parties;

(vi) developing and making available to applicants appropriate geographic information systems and other tools;

(vii) creating and distributing training materials useful to Federal, State, tribal, and local permitting officials; and

(viii) addressing other aspects of infrastructure permitting, as determined by the Council.

(C) Meetings

The Council shall meet not less frequently than annually with groups or individuals representing State, tribal, and local governments that are engaged in the infrastructure permitting process.

(3) Agency CERPOs

An agency CERPO shall—

(A) advise the respective agency councilmember on matters related to environmental reviews and authorizations;

(B) provide technical support, when requested to facilitate efficient and timely processes for environmental reviews and authorizations for covered projects under the jurisdictional responsibility of the agency, including supporting timely identification and resolution of potential disputes within the agency or between the agency and other Federal agencies;

(C) analyze agency environmental review and authorization processes, policies, and authorities and make recommendations to the respective agency councilmember for ways to standardize, simplify, and improve the efficiency of the processes, policies, and authorities, including by implementing guidance issued under paragraph (1)(D) and other best practices, including the use of information technology and geographic information system tools within the agency and across agencies, to the extent consistent with existing law; and

(D) review and develop training programs for agency staff that support and conduct environmental reviews or authorizations.

(d) Administrative support

The Director of the Office of Management and Budget shall designate a Federal agency, other than an agency that carries out or provides support only for projects that are not covered projects, to provide administrative support for the Executive Director, and the designated agency shall, as reasonably necessary, provide support and staff to enable the Executive Director to fulfill the duties of the Executive Director under this subchapter.

(Pub. L. 114–94, div. D, title XLI, §41002, Dec. 4, 2015, 129 Stat. 1743.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

1 So in original.

§4370m–2. Permitting process improvement

(a) Project initiation and designation of participating agencies

(1) Notice

(A) In general

A project sponsor of a covered project shall submit to the Executive Director and the facilitating agency notice of the initiation of a proposed covered project.

(B) Default designation

If, at the time of submission of the notice under subparagraph (A), the Executive Director has not designated a facilitating agency under section 4370m–1(c)(1)(B) of this title for the categories of projects noticed, the agency that receives the notice under subparagraph (A) shall be designated as the facilitating agency.

(C) Contents

Each notice described in subparagraph (A) shall include—

(i) a statement of the purposes and objectives of the proposed project;

(ii) a concise description, including the general location of the proposed project and a summary of geospatial information, if available, illustrating the project area and the locations, if any, of environmental, cultural, and historic resources;

(iii) a statement regarding the technical and financial ability of the project sponsor to construct the proposed project;

(iv) a statement of any Federal financing, environmental reviews, and authorizations anticipated to be required to complete the proposed project; and

(v) an assessment that the proposed project meets the definition of a covered project under section 4370m of this title and a statement of reasons supporting the assessment.

(2) Invitation

(A) In general

Not later than 45 days after the date on which the Executive Director must make a specific entry for the project on the Dashboard under subsection (b)(2)(A), the facilitating agency or lead agency, as applicable, shall—

(i) identify all Federal and non-Federal agencies and governmental entities likely to have financing, environmental review, authorization, or other responsibilities with respect to the proposed project; and

(ii) invite all Federal agencies identified under clause (i) to become a participating agency or a cooperating agency, as appropriate, in the environmental review and authorization management process described in section 4370m–4 of this title.

(B) Deadlines

Each invitation made under subparagraph (A) shall include a deadline for a response to be submitted to the facilitating or lead agency, as applicable.

(3) Participating and cooperating agencies

(A) In general

An agency invited under paragraph (2) shall be designated as a participating or cooperating agency for a covered project, unless the agency informs the facilitating or lead agency, as applicable, in writing before the deadline under paragraph (2)(B) that the agency—

(i) has no jurisdiction or authority with respect to the proposed project; or

(ii) does not intend to exercise authority related to, or submit comments on, the proposed project.

(B) Changed circumstances

On request and a showing of changed circumstances, the Executive Director may designate an agency that has opted out under subparagraph (A)(ii) to be a participating or cooperating agency, as appropriate.

(4) Effect of designation

The designation described in paragraph (3) shall not—

(A) give the participating agency authority or jurisdiction over the covered project; or

(B) expand any jurisdiction or authority a cooperating agency may have over the proposed project.

(5) Lead agency designation

(A) In general

On establishment of the lead agency, the lead agency shall assume the responsibilities of the facilitating agency under this subchapter.

(B) Redesignation of facilitating agency

If the lead agency assumes the responsibilities of the facilitating agency under subparagraph (A), the facilitating agency may be designated as a cooperative or participating agency.

(6) Change of facilitating or lead agency

(A) In general

On the request of a participating agency or project sponsor, the Executive Director may designate a different agency as the facilitating or lead agency, as applicable, for a covered project, if the facilitating or lead agency or the Executive Director receives new information regarding the scope or nature of a covered project that indicates that the project should be placed in a different category under section 4370m–1(c)(1)(B) of this title.

(B) Resolution of dispute

The Chairman of the Council on Environmental Quality shall resolve any dispute over designation of a facilitating or lead agency for a particular covered project.

(b) Permitting dashboard

(1) Requirement to maintain

(A) In general

The Executive Director, in coordination with the Administrator of General Services, shall maintain an online database to be known as the "Permitting Dashboard" to track the status of Federal environmental reviews and authorizations for any covered project in the inventory described in section 4370m–1(c)(1)(A) of this title.

(B) Specific and searchable entry

The Dashboard shall include a specific and searchable entry for each covered project.

(2) Additions

(A) In general

(i) Existing projects

Not later than 14 days after the date on which the Executive Director adds a project to the inventory under section 4370m–1(c)(1)(A) of this title, the Executive Director shall create a specific entry on the Dashboard for the covered project.

(ii) New projects

Not later than 14 days after the date on which the Executive Director receives a notice under subsection (a)(1), the Executive Director shall create a specific entry on the Dashboard for the covered project, unless the Executive Director, facilitating agency, or lead agency, as applicable, determines that the project is not a covered project.

(B) Explanation

If the facilitating agency or lead agency, as applicable, determines that the project is not a covered project, the project sponsor may submit a further explanation as to why the project is a covered project not later than 14 days after the date of the determination under subparagraph (A).

(C) Final determination

Not later than 14 days after receiving an explanation described in subparagraph (B), the Executive Director shall—

(i) make a final and conclusive determination as to whether the project is a covered project; and

(ii) if the Executive Director determines that the project is a covered project, create a specific entry on the Dashboard for the covered project.

(3) Postings by agencies

(A) In general

For each covered project added to the Dashboard under paragraph (2), the facilitating or lead agency, as applicable, and each cooperating and participating agency shall post to the Dashboard—

(i) a hyperlink that directs to a website that contains, to the extent consistent with applicable law—

(I) the notification submitted under subsection (a)(1);

(II)(aa) where practicable, the application and supporting documents, if applicable, that have been submitted by a project sponsor for any required environmental review or authorization; or

(bb) a notice explaining how the public may obtain access to such documents;

(III) a description of any Federal agency action taken or decision made that materially affects the status of a covered project;

(IV) any significant document that supports the action or decision described in subclause (III); and

(V) a description of the status of any litigation to which the agency is a party that is directly related to the project, including, if practicable, any judicial document made available on an electronic docket maintained by a Federal, State, or local court; and


(ii) any document described in clause (i) that is not available by hyperlink on another website.

(B) Deadline

The information described in subparagraph (A) shall be posted to the website made available by hyperlink on the Dashboard not later than 5 business days after the date on which the Federal agency receives the information.

(4) Postings by the Executive Director

The Executive Director shall publish to the Dashboard—

(A) the permitting timetable established under subparagraph (A) or (C) of subsection (c)(2);

(B) the status of the compliance of each agency with the permitting timetable;

(C) any modifications of the permitting timetable;

(D) an explanation of each modification described in subparagraph (C); and

(E) any memorandum of understanding established under subsection (c)(3)(B).

(c) Coordination and timetables

(1) Coordinated project plan

(A) In general

Not later than 60 days after the date on which the Executive Director must make a specific entry for the project on the Dashboard under subsection (b)(2)(A), the facilitating or lead agency, as applicable, in consultation with each coordinating and participating agency, shall establish a concise plan for coordinating public and agency participation in, and completion of, any required Federal environmental review and authorization for the project.

(B) Required information

The Coordinated Project Plan shall include the following information and be updated by the facilitating or lead agency, as applicable, at least once per quarter:

(i) A list of, and roles and responsibilities for, all entities with environmental review or authorization responsibility for the project.

(ii) A permitting timetable, as described in paragraph (2), setting forth a comprehensive schedule of dates by which all environmental reviews and authorizations, and to the maximum extent practicable, State permits, reviews and approvals must be made.

(iii) A discussion of potential avoidance, minimization, and mitigation strategies, if required by applicable law and known.

(iv) Plans and a schedule for public and tribal outreach and coordination, to the extent required by applicable law.

(C) Memorandum of understanding

The coordinated project plan described in subparagraph (A) may be incorporated into a memorandum of understanding.

(2) Permitting timetable

(A) Establishment

As part of the coordination project plan under paragraph (1), the facilitating or lead agency, as applicable, in consultation with each cooperating and participating agency, the project sponsor, and any State in which the project is located, and, subject to subparagraph (C), with the concurrence of each cooperating agency, shall establish a permitting timetable that includes intermediate and final completion dates for action by each participating agency on any Federal environmental review or authorization required for the project.

(B) Factors for consideration

In establishing the permitting timetable under subparagraph (A), the facilitating or lead agency shall follow the performance schedules established under section 4370m–1(c)(1)(C) of this title, but may vary the timetable based on relevant factors, including—

(i) the size and complexity of the covered project;

(ii) the resources available to each participating agency;

(iii) the regional or national economic significance of the project;

(iv) the sensitivity of the natural or historic resources that may be affected by the project;

(v) the financing plan for the project; and

(vi) the extent to which similar projects in geographic proximity to the project were recently subject to environmental review or similar procedures under State law.

(C) Dispute resolution

(i) In general

The Executive Director, in consultation with appropriate agency CERPOs and the project sponsor, shall, as necessary, mediate any disputes regarding the permitting timetable referred to under subparagraph (A).

(ii) Disputes

If a dispute remains unresolved 30 days after the date on which the dispute was submitted to the Executive Director, the Director of the Office of Management and Budget, in consultation with the Chairman of the Council on Environmental Quality, shall facilitate a resolution of the dispute and direct the agencies party to the dispute to resolve the dispute by the end of the 60-day period beginning on the date of submission of the dispute to the Executive Director.

(iii) Final resolution

Any action taken by the Director of the Office of Management and Budget in the resolution of a dispute under clause (ii) shall—

(I) be final and conclusive; and

(II) not be subject to judicial review.

(D) Modification after approval

(i) In general

The facilitating or lead agency, as applicable, may modify a permitting timetable established under subparagraph (A) only if—

(I) the facilitating or lead agency, as applicable, and the affected cooperating agencies, after consultation with the participating agencies and the project sponsor, agree to a different completion date;

(II) the facilitating agency or lead agency, as applicable, or the affected cooperating agency provides a written justification for the modification; and

(III) in the case of a modification that would necessitate an extension of a final completion date under a permitting timetable established under subparagraph (A) to a date more than 30 days after the final completion date originally established under subparagraph (A), the facilitating or lead agency submits a request to modify the permitting timetable to the Executive Director, who shall consult with the project sponsor and make a determination on the record, based on consideration of the relevant factors described under subparagraph (B), whether to grant the facilitating or lead agency, as applicable, authority to make such modification.

(ii) Completion date

A completion date in the permitting timetable may not be modified within 30 days of the completion date.

(iii) Limitation on length of modifications

(I) In general

Except as provided in subclause (II), the total length of all modifications to a permitting timetable authorized or made under this subparagraph, other than for reasons outside the control of Federal, State, local, or tribal governments, may not extend the permitting timetable for a period of time greater than half of the amount of time from the establishment of the permitting timetable under subparagraph (A) to the last final completion date originally established under subparagraph (A).

(II) Additional extensions

The Director of the Office of Management and Budget, after consultation with the project sponsor, may permit the Executive Director to authorize additional extensions of a permitting timetable beyond the limit prescribed by subclause (I). In such a case, the Director of the Office of Management and Budget shall transmit, not later than 5 days after making a determination to permit an authorization of extension under this subclause, a report to Congress explaining why such modification is required. Such report shall explain to Congress with specificity why the original permitting timetable and the modifications authorized by the Executive Director failed to be adequate. The lead or facilitating agency, as applicable, shall transmit to Congress, the Director of the Office of Management and Budget, and the Executive Director a supplemental report on progress toward the final completion date each year thereafter, until the permit review is completed or the project sponsor withdraws its notice or application or other request to which this subchapter applies under section 4370m–9 of this title.

(iv) Limitation on judicial review

The following shall not be subject to judicial review:

(I) A determination by the Executive Director under clause (i)(III).

(II) A determination under clause (iii)(II) by the Director of the Office of Management and Budget to permit the Executive Director to authorize extensions of a permitting timetable.

(E) Consistency with other time periods

A permitting timetable established under subparagraph (A) shall be consistent with any other relevant time periods established under Federal law and shall not prevent any cooperating or participating agency from discharging any obligation under Federal law in connection with the project.

(F) Conforming to permitting timetables

(i) In general

Each Federal agency shall conform to the completion dates set forth in the permitting timetable established under subparagraph (A), or with any completion date modified under subparagraph (D).

(ii) Failure to conform

If a Federal agency fails to conform with a completion date for agency action on a covered project or is at significant risk of failing to conform with such a completion date, the agency shall—

(I) promptly submit to the Executive Director for publication on the Dashboard an explanation of the specific reasons for failing or significantly risking failing to conform to the completion date and a proposal for an alternative completion date;

(II) in consultation with the facilitating or lead agency, as applicable, establish an alternative completion date; and

(III) each month thereafter until the agency has taken final action on the delayed authorization or review, submit to the Executive Director for posting on the Dashboard a status report describing any agency activity related to the project.

(G) Abandonment of covered project

(i) In general

If the facilitating or lead agency, as applicable, has a reasonable basis to doubt the continuing technical or financial ability of the project sponsor to construct the covered project, the facilitating or lead agency may request the project sponsor provide an updated statement regarding the ability of the project sponsor to complete the project.

(ii) Failure to respond

If the project sponsor fails to respond to a request described in clause (i) by the date that is 30 days after receiving the request, the lead or facilitating agency, as applicable, shall notify the Executive Director, who shall publish an appropriate notice on the Dashboard.

(iii) Publication to Dashboard

On publication of a notice under clause (ii), the completion dates in the permitting timetable shall be tolled and agencies shall be relieved of the obligation to comply with subparagraph (F) until such time as the project sponsor submits to the facilitating or lead agency, as applicable, an updated statement regarding the technical and financial ability of the project sponsor to construct the project.

(3) Cooperating State, local, or tribal governments

(A) State authority

If the Federal environmental review is being implemented within the boundaries of a State, the State, consistent with State law, may choose to participate in the environmental review and authorization process under this subsection and to make subject to the process all State agencies that—

(i) have jurisdiction over the covered project;

(ii) are required to conduct or issue a review, analysis, opinion, or statement for the covered project; or

(iii) are required to make a determination on issuing a permit, license, or other approval or decision for the covered project.

(B) Coordination

To the maximum extent practicable under applicable law, the facilitating or lead agency, as applicable, shall coordinate the Federal environmental review and authorization processes under this subsection with any State, local, or tribal agency responsible for conducting any separate review or authorization of the covered project to ensure timely and efficient completion of environmental reviews and authorizations.

(C) Memorandum of understanding

(i) In general

Any coordination plan between the facilitating or lead agency, as applicable, and any State, local, or tribal agency shall, to the maximum extent practicable, be included in a memorandum of understanding.

(ii) Submission to Executive Director

The facilitating or lead agency, as applicable, shall submit to the Executive Director each memorandum of understanding described in clause (i).

(D) Applicability

The requirements under this subchapter shall only apply to a State or an authorization issued by a State if the State has chosen to participate in the environmental review and authorization process pursuant to this paragraph.

(d) Early consultation

The facilitating or lead agency, as applicable, shall provide an expeditious process for project sponsors to confer with each cooperating and participating agency involved and, not later than 60 days after the date on which the project sponsor submits a request under this subsection, to have each such agency provide to the project sponsor information concerning—

(1) the availability of information and tools, including pre-application toolkits, to facilitate early planning efforts;

(2) key issues of concern to each agency and to the public; and

(3) issues that must be addressed before an environmental review or authorization can be completed.

(e) Cooperating agency

(1) In general

A lead agency may designate a participating agency as a cooperating agency in accordance with part 1501 of title 40, Code of Federal Regulations (or successor regulations).

(2) Effect on other designation

The designation described in paragraph (1) shall not affect any designation under subsection (a)(3).

(3) Limitation on designation

Any agency not designated as a participating agency under subsection (a)(3) shall not be designated as a cooperating agency under paragraph (1).

(f) Reporting status of other projects on Dashboard

(1) In general

On request of the Executive Director, the Secretary and the Secretary of the Army shall use best efforts to provide information for inclusion on the Dashboard on projects subject to section 139 of title 23 and section 2348 of title 33 likely to require—

(A) a total investment of more than $200,000,000; and

(B) an environmental impact statement under NEPA.

(2) Effect of inclusion on Dashboard

Inclusion on the Dashboard of information regarding projects subject to section 139 of title 23 or section 2348 of title 33 shall not subject those projects to any requirements of this subchapter.

(Pub. L. 114–94, div. D, title XLI, §41003, Dec. 4, 2015, 129 Stat. 1747.)

References in Text

NEPA, referred to in subsec. (f)(1)(B), means the National Environmental Policy Act of 1969, Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to this chapter. See section 4370m(16) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of this title and Tables.

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–3. Interstate compacts

(a) In general

The consent of Congress is given for 3 or more contiguous States to enter into an interstate compact establishing regional infrastructure development agencies to facilitate authorization and review of covered projects, under State law or in the exercise of delegated permitting authority described under section 4370m–5 of this title, that will advance infrastructure development, production, and generation within the States that are parties to the compact.

(b) Regional infrastructure

For the purpose of this subchapter, a regional infrastructure development agency referred to in subsection (a) shall have the same authorities and responsibilities of a State agency.

(Pub. L. 114–94, div. D, title XLI, §41004, Dec. 4, 2015, 129 Stat. 1755.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–4. Coordination of required reviews

(a) Concurrent reviews

To integrate environmental reviews and authorizations, each agency shall, to the maximum extent practicable—

(1) carry out the obligations of the agency with respect to a covered project under any other applicable law concurrently, and in conjunction with, other environmental reviews and authorizations being conducted by other cooperating or participating agencies, including environmental reviews and authorizations required under NEPA, unless the agency determines that doing so would impair the ability of the agency to carry out the statutory obligations of the agency; and

(2) formulate and implement administrative, policy, and procedural mechanisms to enable the agency to ensure completion of the environmental review process in a timely, coordinated, and environmentally responsible manner.

(b) Adoption, incorporation by reference, and use of documents

(1) 1 State environmental documents; supplemental documents

(A) Use of existing documents

(i) In general

On the request of a project sponsor, a lead agency shall consider and, as appropriate, adopt or incorporate by reference, the analysis and documentation that has been prepared for a covered project under State laws and procedures as the documentation, or part of the documentation, required to complete an environmental review for the covered project, if the analysis and documentation were, as determined by the lead agency in consultation with the Council on Environmental Quality, prepared under circumstances that allowed for opportunities for public participation and consideration of alternatives, environmental consequences, and other required analyses that are substantially equivalent to what would have been available had the documents and analysis been prepared by a Federal agency pursuant to NEPA.

(ii) Guidance by CEQ

The Council on Environmental Quality may issue guidance to carry out this subsection.

(B) NEPA obligations

An environmental document adopted under subparagraph (A) or a document that includes documentation incorporated under subparagraph (A) may serve as the documentation required for an environmental review or a supplemental environmental review required to be prepared by a lead agency under NEPA.

(C) Supplementation of State documents

If the lead agency adopts or incorporates analysis and documentation described in subparagraph (A), the lead agency shall prepare and publish a supplemental document if the lead agency determines that during the period after preparation of the analysis and documentation and before the adoption or incorporation—

(i) a significant change has been made to the covered project that is relevant for purposes of environmental review of the project; or

(ii) there has been a significant circumstance or new information has emerged that is relevant to the environmental review for the covered project.

(D) Comments

If a lead agency prepares and publishes a supplemental document under subparagraph (C), the lead agency shall solicit comments from other agencies and the public on the supplemental document for a period of not more than 45 days, beginning on the date on which the supplemental document is published, unless—

(i) the lead agency, the project sponsor, and any cooperating agency agree to a longer deadline; or

(ii) the lead agency extends the deadline for good cause.

(E) Notice of outcome of environmental review

A lead agency shall issue a record of decision or finding of no significant impact, as appropriate, based on the document adopted under subparagraph (A) and any supplemental document prepared under subparagraph (C).

(c) Alternatives analysis

(1) Participation

(A) In general

As early as practicable during the environmental review, but not later than the commencement of scoping for a project requiring the preparation of an environmental impact statement, the lead agency shall engage the cooperating agencies and the public to determine the range of reasonable alternatives to be considered for a covered project.

(B) Determination

The determination under subparagraph (A) shall be completed not later than the completion of scoping.

(2) Range of alternatives

(A) In general

Following participation under paragraph (1) and subject to subparagraph (B), the lead agency shall determine the range of reasonable alternatives for consideration in any document that the lead agency is responsible for preparing for the covered project.

(B) Alternatives required by law

In determining the range of alternatives under subparagraph (A), the lead agency shall include all alternatives required to be considered by law.

(3) Methodologies

(A) In general

The lead agency shall determine, in collaboration with each cooperating agency at appropriate times during the environmental review, the methodologies to be used and the level of detail required in the analysis of each alternative for a covered project.

(B) Environmental review

A cooperating agency shall use the methodologies referred to in subparagraph (A) when conducting any required environmental review, to the extent consistent with existing law.

(4) Preferred alternative

With the concurrence of the cooperating agencies with jurisdiction under Federal law and at the discretion of the lead agency, the preferred alternative for a project, after being identified, may be developed to a higher level of detail than other alternatives to facilitate the development of mitigation measures or concurrent compliance with other applicable laws if the lead agency determines that the development of the higher level of detail will not prevent—

(A) the lead agency from making an impartial decision as to whether to accept another alternative that is being considered in the environmental review; and

(B) the public from commenting on the preferred and other alternatives.

(d) Environmental review comments

(1) Comments on draft environmental impact statement

For comments by an agency or the public on a draft environmental impact statement, the lead agency shall establish a comment period of not less than 45 days and not more than 60 days after the date on which a notice announcing availability of the environmental impact statement is published in the Federal Register, unless—

(A) the lead agency, the project sponsor, and any cooperating agency agree to a longer deadline; or

(B) the lead agency, in consultation with each cooperating agency, extends the deadline for good cause.

(2) Other review and comment periods

For all other review or comment periods in the environmental review process described in parts 1500 through 1508 of title 40, Code of Federal Regulations (or successor regulations), the lead agency shall establish a comment period of not more than 45 days after the date on which the materials on which comment is requested are made available, unless—

(A) the lead agency, the project sponsor, and any cooperating agency agree to a longer deadline; or

(B) the lead agency extends the deadline for good cause.

(e) Issue identification and resolution

(1) Cooperation

The lead agency and each cooperating and participating agency shall work cooperatively in accordance with this section to identify and resolve issues that could delay completion of an environmental review or an authorization required for the project under applicable law or result in the denial of any approval under applicable law.

(2) Lead agency responsibilities

(A) In general

The lead agency shall make information available to each cooperating and participating agency and project sponsor as early as practicable in the environmental review regarding the environmental, historic, and socioeconomic resources located within the project area and the general locations of the alternatives under consideration.

(B) Sources of information

The information described in subparagraph (A) may be based on existing data sources, including geographic information systems mapping.

(3) Cooperating and participating agency responsibilities

Each cooperating and participating agency shall—

(A) identify, as early as practicable, any issues of concern regarding any potential environmental impacts of the covered project, including any issues that could substantially delay or prevent an agency from completing any environmental review or authorization required for the project; and

(B) communicate any issues described in subparagraph (A) to the project sponsor.

(f) Categories of projects

The authorities granted under this section may be exercised for an individual covered project or a category of covered projects.

(Pub. L. 114–94, div. D, title XLI, §41005, Dec. 4, 2015, 129 Stat. 1755.)

References in Text

NEPA, referred to in subsecs. (a)(1) and (b)(1)(A)(i), (B), means the National Environmental Policy Act of 1969, Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to this chapter. See section 4370m(16) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of this title and Tables.

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

1 So in original. No par. (2) has been enacted.

§4370m–5. Delegated State permitting programs

(a) In general

If a Federal statute permits a Federal agency to delegate to or otherwise authorize a State to issue or otherwise administer a permit program in lieu of the Federal agency, the Federal agency with authority to carry out the statute shall—

(1) on publication by the Council of best practices under section 4370m–1(c)(2)(B) of this title, initiate a national process, with public participation, to determine whether and the extent to which any of the best practices are generally applicable on a delegation- or authorization-wide basis to permitting under the statute; and

(2) not later than 2 years after December 4, 2015, make model recommendations for State modifications of the applicable permit program to reflect the best practices described in section 4370m–1(c)(2)(B) of this title, as appropriate.

(b) Best practices

Lead and cooperating agencies may share with State, tribal, and local authorities best practices involved in review of covered projects and invite input from State, tribal, and local authorities regarding best practices.

(Pub. L. 114–94, div. D, title XLI, §41006, Dec. 4, 2015, 129 Stat. 1758.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–6. Litigation, judicial review, and savings provision

(a) Limitations on claims

(1) In general

Notwithstanding any other provision of law, a claim arising under Federal law seeking judicial review of any authorization issued by a Federal agency for a covered project shall be barred unless—

(A) the action is filed not later than 2 years after the date of publication in the Federal Register of the final record of decision or approval or denial of a permit, unless a shorter time is specified in the Federal law under which judicial review is allowed; and

(B) in the case of an action pertaining to an environmental review conducted under NEPA—

(i) the action is filed by a party that submitted a comment during the environmental review; and

(ii) any commenter filed a sufficiently detailed comment so as to put the lead agency on notice of the issue on which the party seeks judicial review, or the lead agency did not provide a reasonable opportunity for such a comment on that issue.

(2) New information

(A) In general

The head of a lead agency or participating agency shall consider new information received after the close of a comment period if the information satisfies the requirements under regulations implementing NEPA.

(B) Separate action

If Federal law requires the preparation of a supplemental environmental impact statement or other supplemental environmental document, the preparation of such document shall be considered a separate final agency action and the deadline for filing a claim for judicial review of the agency action shall be 2 years after the date on which a notice announcing the final agency action is published in the Federal Register, unless a shorter time is specified in the Federal law under which judicial review is allowed.

(3) Rule of construction

Nothing in this subsection creates a right to judicial review or places any limit on filing a claim that a person has violated the terms of an authorization.

(b) Preliminary injunctive relief

In addition to considering any other applicable equitable factors, in any action seeking a temporary restraining order or preliminary injunction against an agency or a project sponsor in connection with review or authorization of a covered project, the court shall—

(1) consider the potential effects on public health, safety, and the environment, and the potential for significant negative effects on jobs resulting from an order or injunction; and

(2) not presume that the harms described in paragraph (1) are reparable.

(c) Judicial review

Except as provided in subsection (a), nothing in this subchapter affects the reviewability of any final Federal agency action in a court of competent jurisdiction.

(d) Savings clause

Nothing in this subchapter—

(1) supersedes, amends, or modifies any Federal statute or affects the responsibility of any Federal officer to comply with or enforce any statute; or

(2) creates a presumption that a covered project will be approved or favorably reviewed by any agency.

(e) Limitations

Nothing in this section preempts, limits, or interferes with—

(1) any practice of seeking, considering, or responding to public comment; or

(2) any power, jurisdiction, responsibility, or authority that a Federal, State, or local governmental agency, metropolitan planning organization, Indian tribe, or project sponsor has with respect to carrying out a project or any other provisions of law applicable to any project, plan, or program.

(Pub. L. 114–94, div. D, title XLI, §41007, Dec. 4, 2015, 129 Stat. 1758.)

References in Text

NEPA, referred to in subsec. (a)(1)(B), (2)(A), means the National Environmental Policy Act of 1969, Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to this chapter. See section 4370m(16) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of this title and Tables.

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–7. Reports

(a) Report to Congress

(1) In general

Not later than April 15 of each year for 10 years beginning on December 4, 2015, the Executive Director shall submit to Congress a report detailing the progress accomplished under this subchapter during the previous fiscal year.

(2) Contents

The report described in paragraph (1) shall assess the performance of each participating agency and lead agency based on the best practices described in section 4370m–1(c)(2)(B) of this title, including—

(A) agency progress in making improvements consistent with those best practices; and

(B) agency compliance with the performance schedules established under section 4370m–1(c)(1)(C) of this title.

(3) Opportunity to include comments

Each councilmember, with input from the respective agency CERPO, shall have the opportunity to include comments concerning the performance of the agency in the report described in paragraph (1).

(b) Comptroller general report

Not later than 3 years after December 4, 2015, the Comptroller General of the United States shall submit to Congress a report that describes—

(1) agency progress in making improvements consistent with the best practices issued under section 4370m–1(c)(2)(B) of this title; and

(2) agency compliance with the performance schedules established under section 4370m–1(c)(1)(C) of this title.

(Pub. L. 114–94, div. D, title XLI, §41008, Dec. 4, 2015, 129 Stat. 1760.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–8. Funding for governance, oversight, and processing of environmental reviews and permits

(a) In general

The heads of agencies listed in section 4370m–1(b)(2)(B) of this title, with the guidance of the Director of the Office of Management and Budget and in consultation with the Executive Director, may, after public notice and opportunity for comment, issue regulations establishing a fee structure for project proponents to reimburse the United States for reasonable costs incurred in conducting environmental reviews and authorizations for covered projects.

(b) Reasonable costs

As used in this section, the term "reasonable costs" shall include costs to implement the requirements and authorities required under sections 4370m–1 and 4370m–2 of this title, including the costs to agencies and the costs of operating the Council.

(c) Fee structure

The fee structure established under subsection (a) shall—

(1) be developed in consultation with affected project proponents, industries, and other stakeholders;

(2) exclude parties for which the fee would impose an undue financial burden or is otherwise determined to be inappropriate; and

(3) be established in a manner that ensures that the aggregate amount of fees collected for a fiscal year is estimated not to exceed 20 percent of the total estimated costs for the fiscal year for the resources allocated for the conduct of the environmental reviews and authorizations covered by this subchapter, as determined by the Director of the Office of Management and Budget.

(d) Environmental Review and Permitting Improvement Fund

(1) In general

All amounts collected pursuant to this section shall be deposited into a separate fund in the Treasury of the United States to be known as the "Environmental Review Improvement Fund" (referred to in this section as the "Fund").

(2) Availability

Amounts in the Fund shall be available to the Executive Director, without appropriation or fiscal year limitation, solely for the purposes of administering, implementing, and enforcing this subchapter, including the expenses of the Council.

(3) Transfer

The Executive Director, with the approval of the Director of the Office of Management and Budget, may transfer amounts in the Fund to other agencies to facilitate timely and efficient environmental reviews and authorizations for proposed covered projects.

(e) Effect on permitting

The regulations adopted pursuant to subsection (a) shall ensure that the use of funds accepted under subsection (d) will not impact impartial decision-making with respect to environmental reviews or authorizations, either substantively or procedurally.

(f) Transfer of appropriated funds

(1) In general

The heads of agencies listed in section 4370m–1(b)(2)(B) of this title shall have the authority to transfer, in accordance with section 1535 of title 31, funds appropriated to those agencies and not otherwise obligated to other affected Federal agencies for the purpose of implementing the provisions of this subchapter.

(2) Limitation

Appropriations under title 23 and appropriations for the civil works program of the Army Corps of Engineers shall not be available for transfer under paragraph (1).

(Pub. L. 114–94, div. D, title XLI, §41009, Dec. 4, 2015, 129 Stat. 1760.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–9. Application

This subchapter applies to any covered project for which—

(1) a notice is filed under section 4370m–2(a)(1) of this title; or

(2) an application or other request for a Federal authorization is pending before a Federal agency 90 days after December 4, 2015.

(Pub. L. 114–94, div. D, title XLI, §41010, Dec. 4, 2015, 129 Stat. 1761.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–10. GAO report

Not later than 3 years after December 4, 2015, the Comptroller General of the United States shall submit to Congress a report that includes an analysis of whether the provisions of this subchapter could be adapted to streamline the Federal permitting process for smaller projects that are not covered projects.

(Pub. L. 114–94, div. D, title XLI, §41011, Dec. 4, 2015, 129 Stat. 1761.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–11. Savings provision

Nothing in this subchapter amends the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(Pub. L. 114–94, div. D, title XLI, §41012, Dec. 4, 2015, 129 Stat. 1761.)

References in Text

The National Environmental Policy Act of 1969, referred to in text, is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of this title and Tables.

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.

§4370m–12. Sunset

This subchapter shall terminate 7 years after December 4, 2015.

(Pub. L. 114–94, div. D, title XLI, §41013, Dec. 4, 2015, 129 Stat. 1761.)

Codification

Section was enacted as part of the Fixing America's Surface Transportation Act, also known as the FAST Act, and not as part of the National Environmental Policy Act of 1969 which comprises this chapter.