Notice: The uscode.house.gov website is currently operating in a temporary format. While the United States Code remains available from its authoritative source, some website features and functionality are temporarily unavailable.
The United States Code Online is current through Public Law 119-120 (October 7, 2026).
Search & Browse Currency and Updating Classification Tables Popular Name Tool Positive Law Codification Editorial Reclassification Downloads
43 U.S.C. 1555: Federal Power Act inapplicable to Colorado River between Hoover Dam and Glen Canyon DamText contains those laws in effect through Public Law 119-120 (October 7, 2026).
From Title 43-PUBLIC LANDSCHAPTER 32-COLORADO RIVER BASIN PROJECT

§1555. Federal Power Act inapplicable to Colorado River between Hoover Dam and Glen Canyon Dam

Part I of the Federal Power Act [16 U.S.C. 791a et seq.] shall not be applicable to the reaches of the main stream of the Colorado River between Hoover Dam and Glen Canyon Dam until and unless otherwise provided by Congress.

( Pub. L. 90–537, title VI, § 605 , Sept. 30, 1968 , 82 Stat. 901 .)

Editorial Notes

References in Text

The Federal Power Act, referred to in text, is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Federal Power Act is classified generally to subchapter I (§ 791a et seq.) of chapter 12 of Title 16, Conservation. For complete classification of this Act to the Code, see section 791a of Title 16 and Tables.