Notice: The uscode.house.gov website is currently operating in a temporary format. While the United States Code remains available from its authoritative source, some website features and functionality are temporarily unavailable.
The United States Code Online is current through Public Law 119-120 (October 7, 2026).
Search & Browse Currency and Updating Classification Tables Popular Name Tool Positive Law Codification Editorial Reclassification Downloads
43 U.S.C. 390h–12j: Orange County Regional Water Reclamation ProjectText contains those laws in effect through Public Law 119-120 (October 7, 2026).
From Title 43-PUBLIC LANDSCHAPTER 12-RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT

§390h–12j. Orange County Regional Water Reclamation Project

(a)  Authorization

The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the Orange County Regional Water Reclamation Project, to reclaim and reuse water within the service area of the Orange County Water District in California.

(b)  Cost share

The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.

(c)  Limitation

The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).

( Pub. L. 102–575, title XVI, § 1624 , as added Pub. L. 104–266, § 2(a)(2) , Oct. 9, 1996 , 110 Stat. 3292 ; amended Pub. L. 111–11, title IX, § 9111(c) , Mar. 30, 2009 , 123 Stat. 1318 .)

Editorial Notes

Amendments

2009⁠—Pub. L. 111–11, § 9111(c)(1), struck out “Phase 1 of the” before “Orange County” in section catchline.

Subsec. (a). Pub. L. 111–11, § 9111(c)(2), struck out “phase 1 of” before “the Orange County”.