Notice: The uscode.house.gov website is currently operating in a temporary format. While the United States Code remains available from its authoritative source, some website features and functionality are temporarily unavailable.
The United States Code Online is current through Public Law 119-120 (October 7, 2026).
Search & Browse Currency and Updating Classification Tables Popular Name Tool Positive Law Codification Editorial Reclassification Downloads
15 U.S.C. 7307: National Construction Safety Team reportText contains those laws in effect through Public Law 119-120 (October 7, 2026).
From Title 15-COMMERCE AND TRADECHAPTER 99-NATIONAL CONSTRUCTION SAFETY TEAM
Jump To: Source Credit

§7307. National Construction Safety Team report

Not later than 90 days after completing an investigation, a Team shall issue a public report which includes⁠—

(1)  an analysis of the likely technical cause or causes of the building failure investigated;

(2)  any technical recommendations for changes to or the establishment of evacuation and emergency response procedures;

(3)  any recommended specific improvements to building standards, codes, and practices; and

(4)  recommendations for research and other appropriate actions needed to help prevent future building failures.

( Pub. L. 107–231, § 8 , Oct. 1, 2002 , 116 Stat. 1475 .)