43 U.S.C. 390h–12p: Tooele Wastewater Treatment and Reuse ProjectText contains those laws in effect through Public Law 119-120 (October 7, 2026).
From Title 43-PUBLIC LANDSCHAPTER 12-RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT
Jump To: Source Credit
§390h–12p. Tooele Wastewater Treatment and Reuse Project
(a) Authorization
The Secretary, in cooperation with Tooele City, Utah, is authorized to participate in the design, planning, and construction of the Tooele Wastewater Treatment and Reuse Project.
(b) Cost share
The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.
(c) Limitation
The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).
( Pub. L. 102–575, title XVI, § 1630 , as added Pub. L. 104–266, § 2(a)(2) , Oct. 9, 1996 , 110 Stat. 3294 .)
