Notice: The uscode.house.gov website is currently operating in a temporary format. While the United States Code remains available from its authoritative source, some website features and functionality are temporarily unavailable.
The United States Code Online is current through Public Law 119-120 (October 7, 2026).
Search & Browse Currency and Updating Classification Tables Popular Name Tool Positive Law Codification Editorial Reclassification Downloads
43 U.S.C. 390h–16: Willow Lake Natural Treatment System ProjectText contains those laws in effect through Public Law 119-120 (October 7, 2026).
From Title 43-PUBLIC LANDSCHAPTER 12-RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT
Jump To: Source Credit

§390h–16. Willow Lake Natural Treatment System Project

(a)  Authorization

The Secretary, in cooperation with the city of Salem, Oregon, is authorized to participate in the design, planning, and construction of the Willow Lake Natural Treatment System Project to reclaim and reuse wastewater within and without the service area of the city of Salem.

(b)  Cost share

The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.

(c)  Limitation

The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.

( Pub. L. 102–575, title XVI, § 1634 , as added Pub. L. 105–321, § 6(a) , Oct. 30, 1998 , 112 Stat. 3025 .)