[USC02] 50 USC 2632: Multi-year plan for clean-up
Result 1 of 1
   
 

*Public Laws 116-284 through 117-1 have been enacted but classifications have not yet been finalized. The currency ("laws in effect") date does not reflect acts for which classification has not been finalized.

50 USC 2632: Multi-year plan for clean-up Text contains those laws in effect on March 4, 2021
From Title 50-WAR AND NATIONAL DEFENSECHAPTER 42-ATOMIC ENERGY DEFENSE PROVISIONSSUBCHAPTER IV-DEFENSE ENVIRONMENTAL CLEANUP MATTERSPart D-Savannah River Site, South Carolina

§2632. Multi-year plan for clean-up

The Secretary of Energy shall develop and implement a multi-year plan for the clean-up of nuclear waste at the Savannah River Site that results, or has resulted, from the following:

(1) Nuclear weapons activities carried out at the site.

(2) The processing, treating, packaging, and disposal of Department of Energy domestic and foreign spent nuclear fuel rods at the site.

(Pub. L. 107–314, div. D, title XLIV, §4452, formerly Pub. L. 104–201, div. C, title XXXI, §3142(e), Sept. 23, 1996, 110 Stat. 2836 ; renumbered Pub. L. 107–314, div. D, title XLIV, §4452, by Pub. L. 108–136, div. C, title XXXI, §3141(g)(22), Nov. 24, 2003, 117 Stat. 1769 .)

Amendments

2003-Pub. L. 108–136, §3141(g)(22)(C), inserted section catchline, struck out former subsec. heading, and inserted in text "of Energy" after "The Secretary".